Difference between revisions of "BuShips:CO Manual/Processes/Name Request"
Jump to navigation
Jump to search
(BuShips CO Manual ship name request page added) |
(Added categories) |
||
Line 24: | Line 24: | ||
==== Note ==== | ==== Note ==== | ||
*Names not on the complete list available to 3SL must be approved by BuNine. Turnaround time for such an approval is a minimum of 6 months, and usually longer. | *Names not on the complete list available to 3SL must be approved by BuNine. Turnaround time for such an approval is a minimum of 6 months, and usually longer. | ||
[[Category:BuShips]] | |||
[[Category:CO Manual|002]] | |||
[[Category:Manuals]] |
Revision as of 14:56, 24 October 2019
BuShips CO Manual Quick Navigation | ||||||||
---|---|---|---|---|---|---|---|---|
Front | Welcome | Contacts | Preparation | Processes | Chapter Operations | Membership & Activities | Mentorship |
Ship Name Requests
Light Attack Craft
Names for LACs are more like call-signs and can be chosen by the crew/CO. However, names must be sufficiently different than other ships and must be approved by 3SL/D3SL.
Process Summary
- Initial request is sent to buships@trmn.org. In order to expedite the process, multiple possible names should be sent in order of preference.
- 3SL or D3SL will identify the first name on the list that is an acceptable new LAC name.
- The Director of Small Craft will reply with the approved name or a request for additional possibilities if none of the supplied names are acceptable.
Hyper-capable Ships
Names for hyper-capable ships are supplied to TRMN by BuNine.
Process Summary
- Initial request is sent to buships@trmn.org.
- The request should indicate, at a minimum, the hull size desired and if the request is for a ship commissioning, upgrade, or downgrade
- If a particular class of ship is desired, that should also be indicated in the request.
- A list of up to three (3) ship names that meet the ship class and type requested will be generated.
- The ship names are given to the Construction and Refit Command.
- A member of the Construction and Refit Command will send the options back to the requestor along with the appropriate BuShips request form.
Note
- Names not on the complete list available to 3SL must be approved by BuNine. Turnaround time for such an approval is a minimum of 6 months, and usually longer.