BuShips Directive 1103-03

From TRMN
Revision as of 22:20, 26 December 2018 by LBonilla (talk | contribs) (fmt, +lks)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NOTE: This Wiki is the authoritative source for orders per the Fourth Space Lord. All orders have been provided by the issuing authority or are as posted in the TRMN Forums.
TRMN Orders & Directives
Joint Chiefs Directives (TRMN) Admiralty Orders (TRMN) Protector's Orders (GSN) Naval Directives (RMN) Corps Directives (RMMC) Army Directives (RMA) Home Office Directives (Civilian)

BuShips Directive 1103-03 was issued 24 March 2011 under the authority of the Third Space Lord. It commissioned the GNS Matthias (DD-28) as the first Grayson ship.

Order Text

Effective as of 0001 Hours on March 25, 2011, it is my pleasure to announce the commissioning of the GNS Matthias (DD-28). This is an Apostle-class Destroyer under the Command of LCDR Anne Zecca and is assigned to the Grayson Space Navy.

As of the date of Commissioning, the following personnel are brevetted to the indicated ranks below:

In Service to Her Majesty, the Queen

Issued by:
Admiral John Roberts
Third Space Lord


External Links